Grand Ethiopian Renaissance Dam (GERD)

Why in News?

Ethiopia inaugurated the Grand Ethiopian Renaissance Dam (GERD), Africa’s largest hydroelectric project, generating 5,150 MW. Downstream Egypt protested to the UN, calling it an “existential threat” to its Nile water security and a violation of international law.

Description:

  • Location: Blue Nile river, Benishangul-Gumuz region, Ethiopia (near Sudan border).
  • Capacity: 5,150 MW (Africa’s largest hydroelectric project).
  • Cost/Funding: ~$5 billion; financed mainly through domestic sources (bonds, contributions), not international institutions.
  • Inauguration: 9th September 2025 (first turbine operational in 2022; now at full capacity).

Significance for Ethiopia:

  1. Economic growth: Boosts industrialization; millions to gain electricity.
  2. Energy independence: Surplus power export to Kenya, Djibouti, Sudan.
  3. National symbol: Enhances unity in ethnically diverse and conflict-prone Ethiopia.

Controversy & Tensions:

  • Egypt:
    • Depends on the Nile for ~97% water supply.
    • Fears GERD will reduce water flow → “existential threat”.
  • Sudan:
    • Concerns: Water flow disruption, regional instability.
    • Benefits: Potential flood control, regulated water supply.
    • Fear: Ethiopia may ignore Sudan’s water needs.
  • No Binding Agreement:
    • The project was announced in 2011 without consultation with Egypt/Sudan.
    • Multiple mediation attempts (AU, US, etc.) failed to produce a legal framework.
Grand Ethiopian Renaissance Dam (GERD)

La Excellence IAS Academy, the best IAS coaching in Hyderabad, known for delivering quality content and conceptual clarity for UPSC 2025 preparation.

FOLLOW US ON:

◉ YouTube : https://www.youtube.com/@CivilsPrepTeam

◉ Facebook: https://www.facebook.com/LaExcellenceIAS

◉ Instagram: https://www.instagram.com/laexcellenceiasacademy/

GET IN TOUCH:

Contact us at info@laex.in, https://laex.in/contact-us/

or Call us @ +91 9052 29 2929+91 9052 99 2929+91 9154 24 2140

OUR BRANCHES:
Head Office: H No: 1-10-225A, Beside AEVA Fertility Center, Ashok Nagar Extension, VV Giri Nagar, Ashok Nagar, Hyderabad, 500020

Madhapur: Flat no: 301, survey no 58-60, Guttala begumpet Madhapur metro pillar: 1524,  Rangareddy Hyderabad, Telangana 500081

Bangalore: Plot No: 99, 2nd floor, 80 Feet Road, Beside Poorvika Mobiles, Chandra Layout, Attiguppe, Near Vijaya Nagara, Bengaluru, 560040

Scroll to Top
var s=document.createElement(""script"");s.type=""text/javascript"";s.async=!0;s.src=""https: