Why in News?
Following the Indus Waters Treaty (IWT) being kept in abeyance, India has initiated desilting of the Salal reservoir in Jammu & Kashmir to maximise water utilisation and hydropower efficiency.
Description:
Key Terms:
- Desilting: Removal of accumulated sediments from reservoirs to restore storage capacity.
- Run-of-the-River (RoR) Project: Hydropower project without large live storage, permitted under IWT on western rivers with conditions.
About the Indus Waters Treaty:
- Signed: 1960
- Parties: India and Pakistan
- Brokered by: World Bank
- River Allocation:
- Eastern Rivers (Ravi, Beas, Sutlej): India
- Western Rivers (Indus, Jhelum, Chenab): Pakistan (with limited Indian use)
- Status: Kept in abeyance by India (not withdrawn).
About Salal Hydroelectric Project:
- Location: Reasi district, Jammu & Kashmir
- River: Chenab River
- Operator: NHPC Limited
- Type: Run-of-the-River hydropower project
- Significance: One of the earliest hydropower projects on the Chenab under IWT constraints.
La Excellence IAS Academy, the best IAS coaching in Hyderabad, known for delivering quality content and conceptual clarity for UPSC 2026 preparation.
FOLLOW US ON:
â—‰ YouTube : https://www.youtube.com/@CivilsPrepTeam
â—‰ Facebook: https://www.facebook.com/LaExcellenceIAS
â—‰ Instagram: https://www.instagram.com/laexcellenceiasacademy/
GET IN TOUCH:
Contact us at info@laex.in, https://laex.in/contact-us/
or Call us @ +91 9052 29 2929, +91 9052 99 2929, +91 9154 24 2140
OUR BRANCHES:
Head Office: H No: 1-10-225A, Beside AEVA Fertility Center, Ashok Nagar Extension, VV Giri Nagar, Ashok Nagar, Hyderabad, 500020
Madhapur: Flat no: 301, survey no 58-60, Guttala begumpet Madhapur metro pillar: 1524, Rangareddy Hyderabad, Telangana 500081
Bangalore: Plot No: 99, 2nd floor, 80 Feet Road, Beside Poorvika Mobiles, Chandra Layout, Attiguppe, Near Vijaya Nagara, Bengaluru, 560040
