The Reality Behind UPSC Prelims
Every year, over 12 lakh aspirants register for UPSC Civil Services Examination. Out of them, only about 14,000 qualify Prelims — a ruthless filter, more psychological than academic. Failing to clear Prelims doesn’t mean a lack of capability; it often indicates a need for strategic recalibration.
Let’s unpack what could have gone wrong, learn from topper-tested strategies, and design a clear, actionable plan for your next attempt.
What Went Wrong This Year?
- Insufficient Emphasis on UPSC’s Pattern Change:
Most aspirants are overly dependent on static material and fail to factor in the dynamic pattern of the Prelims paper, particularly with recent years placing more focus on application-based and analytical questions rather than fact-based ones. This year paper seemed familiar with PYQ themes.
- Overlooking CSAT Preparation:
A large majority of serious contenders falter in CSAT, believing it to be “easy” owing to their academic background. But even engineers and MBA holders have faltered here because of complacency. This year CSAT, Comprehesion was time taking, Aptitude was of higher level.
- Excessive Focus on Book-Reading, Inadequate Practice of Mock Tests:
Prelims is not merely about being knowledgeable but also about intelligent risk-taking and elimination skills that are only evolved through extensive practice of mock tests under timed environments. This year, despite some relief, the questions from Science and Technology had options with less scope for any elimination, making thinks worse for those who prepared conventionally.
- Inadequate Revision and Overburdened Resources:
Revising behind several papers without synthesizing information results in superficial preparation and disorientation in the exam hall. Many students ignored static and read Current Affairs from multiple sources. But the paper had a mix of static and dynamic inter-wined in the same question.
- Poor Time Management and Exam Day Anxiety
Candidates tend to lose their calm during the paper, which results in poor decision-making, precision, and time allocation. GS-I paper was so time absorbing that the aspirants confused between the statements and overlooked them and marked wrong answers.
What UPSC Toppers Did Differently?: Lessons from 2023–2024 Rankers
Let’s take a lesson from recent UPSC toppers who recovered from failed attempts:
- A Madhu (AIR 544, UPSC CSE 2024)
Cleared in 3rd attempt after twice failing Prelims.
Moved from passive reading to active recitation through self-made one-pagers for each subject.
Gave special emphasis to CSAT from February, studying 30 minutes daily and full-length tests on Sundays.
- Pradeep Singh (AIR 1, 2019)
Once failed in Prelims before breaking it.
Treated PYQs seriously — solved last 10 years many times to get a grasp of UPSC’s changing trends.
Strict test schedule followed — 50+ tests prior to Prelims with post-test analysis more crucial than the test itself.
- Anu Kumari (AIR 2, 2017)
Failed Prelims by a difference in her first attempt.
Reduced excessive study material, studied only NCERTs, standard books, and relied on one monthly magazine for current affairs.
Had micro-revision — revised the same notes several times rather than incorporating new material.
What Should be done now?
Take a week break. You deserve a break after all the hardwork. You join some mains related test series cum mentorship programme. You can book a free mentorship session with our mentors at La Excellence and take their inputs. We are open for you. But, finish all the GS mains topics before December, 2025 including your optionals. You can join Shiksha test series programme.
A Clear Roadmap for Your Next Attempt:
- Prelims-First Approach :
Give Prelims a top priority until the exam date. Overlap Mains preparation along withit. What you can do now is to prepare for mains alongside the Prelims.Emphasize conceptual clarity, test-taking techniques, and revision. La Excellence has launched a personalised mentorship programme to help you.
2.Create a PYQ-Centric Strategy
Practice UPSC Prelims PYQs from 2013 to 2025 at least three times. Mark down question patterns, commonly asked themes, and elimination methods. In 2025, 8 questions in history came from PYQs, in Geography PYQ themes repeated well.
3 . Take atleast ten Full-Length Mock Tests
Simulate exam conditions (2 hours, OMR sheet, no breaks).
Post-test analysis: Take twice the test time to analyze error, accuracy rate, and foolish mistakes.
4 . Let Revision Be Your Tool
- Adopt the 3-2-1 Revision Rule:
- 3 revisions prior to February
- 2 revisions in March-April
- 1 revision in the last month
- Revise the same, not new.
5 . CSAT Daily Practice
30 minutes of quant, reasoning, comprehension daily. Weekly full-length CSAT tests from February onwards if you are not so strong in subject.
- Maximize Current Affairs
Stay with a single credible source — PIB and SPARK magazine of La Excellence.
Prepare brief notes on schemes, reports, indices, and environmental issues.
- Mental Preparation & Emotional Control
Practice mindfulness exercises, journaling, or brief evening strolls.
Steer clear of social media excess and toxic peer comparison. Everyone has their own strategy. Approach your mentor and ask them to design a strategy for you.
Last Thoughts: What This Failure Actually Means
A Prelims failure is not a judgment on your potential, but a message: reform your approach, refine your strategy, and acquire resilience.
Each topper’s path has witnessed this stage — it was their reaction that differed.
“Fall seven times, stand up eight.”
UPSC is a test of grit as well as brains. And if you can rewire your preparation, you can crack this code as well.
Your Next Prelims Can Be Your Breakthrough — If You Choose to Evolve, Not Quit.
La Excellence is conducting free mock test of the UPSC 2025 Prelims paper in coming days. We will update you the details shortly.
you can watch the analysis of the UPSC 2025 prelims exam by our mentor Mr. Siddesh Kumar here:
For more such preparation strategies, you can read here: https://laex.in/category/preparation-strategy/
La Excellence IAS Academy, the best IAS coaching in Hyderabad, known for delivering quality content and conceptual clarity for UPSC 2025 preparation.
▶️ FOLLOW US ON:
◉ Youtube : https://www.youtube.com/@CivilsPrepTeam
◉ Facebook: https://www.facebook.com/LaExcellenceIAS
◉ Instagram: https://www.instagram.com/laexcellenceiasacademy/
▶️ GET IN TOUCH:
Contact us at info@laex.in, https://laex.in/contact-us/
or Call us @ +91 9052 29 2929, +91 9052 99 2929, +91 9154 24 2140
▶️ OUR BRANCHES:
Head Office: H No: 1-10-225A, Beside AEVA Fertility Center, Ashok Nagar Extension, VV Giri Nagar, Ashok Nagar, Hyderabad, 500020
Madhapur: Flat no: 301, survey no 58-60, Guttala begumpet Madhapur metro pillar : 1524, Rangareddy Hyderabad, Telangana 500081
Bangalore: Plot No: 99, 2nd floor, 80 Feet Road, Beside Poorvika Mobiles, Chandra Layout, Attiguppe, Near Vijaya Nagara, Bengaluru, 560040.